Rillsoft AI
22 management questions on projects, capacity and costs
Management questions on status, schedules, capacity and costs: verification status, sample dashboard and prompt configurator.
Which delivery dates are at risk? Which roles are short of capacity? Which projects need attention first? The catalogue brings together management questions for business leaders, project managers and PMOs. View the sample dashboard or assemble your report in the configurator.
Each question shows its status: Verified prompt means that a prompt page with an accepted run answers the question. Partly covered means that a verified prompt answers part of it; the card states the limit. Planned means that no verified prompt is available yet. The configurator offers only verified chapters.
Rillsoft Project supplies the calculated planning data. The AI applies defined analysis rules and creates the report. Capacity shortfalls are calculated per job role from daily values. Costs compare the current overall plan with the baseline, not recorded actual costs.
Choose chapters, copy the prompt and run it in your connected AI client. This page does not read project data. What your AI client transmits to its provider depends on its settings and terms.
22 management questions · 20 verified · 2 partly covered · 0 planned
Three steps to your report
- Choose chaptersSet the scope, period and verified questions.
- Copy the promptReview and copy the assembled text.
- Run it in your AI clientYour connected AI client creates the report from Rillsoft Project.
Configure a management analysis
Choose the scope, period and verified chapters. This page assembles your prompt. Copy it into your connected AI client. The prompt requests a PDF in A4 landscape and three key findings in the chat; print-ready HTML is the fallback when PDF creation is unavailable.
Your selection is processed in the browser. The configurator does not read project data or run an analysis. Your connected AI client then accesses Rillsoft Project; transmission to an AI provider depends on that client’s settings and terms. Connect your AI client
Your prompt
Create a management dashboard from Rillsoft Project with the chapters below.
First ask me for these details and do not guess:
- Scope: single project, selected projects or portfolio (name the open one and let me confirm),
- Period: start and end (if I give none, suggest the project period),
- Time scale: day, week, month or quarter (suggest one with at most about 30 intervals),
- Capacity unit: hours, person-days, person-weeks or FTE (name the one set in the project; FTE is available for demand only),
- Reference date: name the project's status date.
Summarise the details in one sentence before reading any data.
Chapters:
1. Overall status: per project traffic lights for schedule, progress, resources and costs – schedule amber above 0, red above 5 working days of shift of fixed milestones; progress amber above 5, red above 15 percentage points behind; resources amber above 0, red above 10 % proportional shortfall; costs amber above 5, red above 10 % against the baseline, in a portfolio per project from the project file, “not rated” without a baseline. The overall light is the worst rated light; for every light that is not green, the figure behind it.
2. Attention list: projects by need for action – overall light, then number of red and amber lights, then the values of those that are not green in the order schedule, resources, progress, costs; per project the figures behind the colour and what to clarify, marked as a recommendation.
Read each view once and use the figures for all chapters; capacity always from the staff capacity comparison at day scale. Calculate capacity per role only, not per team. Check the totals in each chapter; if one differs, name the difference instead of the chapter. Every sentence in the result carries a figure from Rillsoft Project; recommendations only when marked as such. Reset the view afterwards, undo every plan change and do not save project files.
Output: Provide the complete management report as a downloadable PDF file in A4 landscape. Use readable charts, complete tables and clean page breaks; check that nothing is clipped before providing the file. Also give three key findings with figures from the report in the chat. If you cannot create a PDF, provide a print-ready HTML file instead and explain “Open in a browser → Print → Save as PDF”. If you cannot provide a file, output the complete HTML code and state that limitation. Link only to files you have actually created.The 22 questions
No questions match this selection. Reset the filters or choose another topic.
A · Project status and progress
01
What is the current overall state of the selected projects?
Verified prompt02
Which projects are behind their planned progress?
Verified prompt03
Which projects show the largest schedule variances?
Verified prompt04
Which projects or project phases are developing particularly critically?
Verified promptB · Schedule and milestones
05
Which projects are likely to miss their completion date?
Verified prompt06
Which important milestones fall within the analysis period?
Verified prompt07
Which tasks are on the critical path?
Verified prompt08
Which schedule shifts affect other projects?
Partly coveredC · Resources and capacity
09
How do capacity demand and available capacity compare in the selected period?
Verified prompt10
Which roles are overloaded?
Verified prompt11
When and where do the largest capacity bottlenecks occur?
Verified prompt12
Which projects compete for the same resources?
- Resource conflict matrix: which project carries which bottleneck?
- Which projects compete for the same resources?
13
Which resources have spare capacity?
Verified prompt14
Which projects are hit hardest by resource bottlenecks?
Verified promptD · Forecasts and risks
15
Which critical developments are to be expected in the coming period?
Verified prompt16
Which projects carry the highest risk of a schedule delay?
Verified prompt17
How does resource utilisation change over the analysis period?
Verified promptE · Management decisions
18
Which projects need particular attention given their current situation?
Verified prompt19
Which resource reallocations could reduce existing bottlenecks?
Verified prompt20
Which measures are needed to improve the project and schedule situation?
Verified promptF · Costs
21
Which projects exceed their planned costs – and why?
- Which projects exceed their planned costs?
- Draw baseline and current plan costs as a bar chart
- Draw baseline and current plan costs for a period
22
How are costs and invoicing spread over time?
Partly coveredParameters for all questions
The AI asks for these details once before the first call and does not guess; they apply to all selected questions.
| Parameter | Options | What the AI does |
|---|---|---|
| Scope | Single project, selected projects, portfolio | The AI names the open project or portfolio and lets you confirm it. |
| Period | Week, month, quarter or start and end | If you give none, the AI suggests the project period. |
| Time scale | Day, week, month, quarter | Suggestion with at most about 30 intervals; the AI calculates bottlenecks from daily values. |
| Capacity unit | Hours, person-days, person-weeks, FTE | Values come in the program's unit; FTE is available for demand only. |
| Reference date | Status date of the project | An earlier state is only available through a baseline. |